Thursday, February 11, 2016

Things get boiling...

Spring 2015, saw us deciding to host a crawfish boil.  While we had a concrete patio, to Robyn’s chagrin, I decided a deck would be a great thing to have for entertaining.
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-07 15.35.27.jpg
Rather than attaching the deck to the house which would have required permits and the setting of piers below the frost line (more than 42 inches deep), I decided to build a floating deck using pre-case blocks.
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-10 14.44.40.jpg
As the deck was framed up, I had to leave flooring so we could get in and out of the back door.
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-11 10.16.20.jpg
Rather than using regular decking, I decided to use 2x6s as the flooring for the additional strength and durability.
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-06 07.18.22.jpg
Spread over 3 weekends and several evenings…
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-12 10.18.57.jpg
…and with Beef’s encouragement
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-12 19.41.00.jpg
… the deck was constructed…
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-14 19.18.42.jpg
…and coated with Thompson’s Water Sealant.
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-18 10.56.34.jpg
Just in time for the crawfish which were Fedexed from Louisiana.
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-18 16.50.12.jpg
To be introduced to some Minnesotans.

C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2015-04-18 17.28.46.jpg

Getting rid of the slippery slope...

Also in the spring of 2013, we started to work on that scary slope on the side yard.  I was afraid to mow it because the slope was so steep.  Another one of Robyn’s Craigslist finds, she found a discontinued line of Anchor Blocks that we bought directly from the factory for about 10% of what they would have cost us at one of the big box stores.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2013-12-18 20.39.39-1.jpg
At 16,000 pounds total weight, it was more than I could carry in the back of my pickup so we had them delivered.  As usual, I overestimated what was needed so we were able to do a couple of other pet projects .
To meet code requirements, we needed to keep the wall less than 2 foot tall (and frankly I didn’t want to go higher than that anyway.) To do that, we decided to terrace the slope, digging back 4 foot from the existing wall by hand.  A base layer was put down, compacted and then the blocks were laid with a piece of plastic drain tile behind the wall with a weed barrier.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2013-12-18 20.39.49-3.jpg
After we built this first wall, we unfortunately learned that you should fill up behind the wall as you set the blocks.  We sat on it and it fell down.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2013-12-18 20.39.49-1.jpg
Robyn was an awesome helper.  Moving blocks like a champ.  One of the side benefits to building the wall we found after that first weekend is nothing is wrong with Robyn’s heart.  She started having chest pains Sunday evening after the first weekend of work and we made a quick run to the emergency room.  Tests the next day confirmed that she had strained her pectoral muscle and her heart was 100% a-ok.
Whew!
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2013-12-18 20.39.48-1.jpg
Both ends of the retaining wall were curved to match the existing slope as well as the stairwell walls.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2013-12-18 20.39.50-1.jpg
I had estimated that the wall would be 35 foot long.  And if we could have made it to the edge of the property line, it would have been that long. The gorgeous lilacs that are along that edge of our property blocked us though.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2013-12-18 20.39.51-2.jpg
The existing retaining wall on that side had been repaired sometime in the past but the repair was never completed.  I used some of the blocks to cap the open blocks that people walking down the street would stuff trash into.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2013-12-18 20.39.47-4.jpg
For being at the top of a hill, I was surprised at the number of river rocks we found, but this was the only bottle we found.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2013-12-18 20.42.39-1.jpg
Before the ground froze, we were able to get the second terrace dug out and that wall built.
This was as far as I had originally planned to go with the wall but we had nearly half the blocks left.  So spring 2014, as soon as the ground thawed, the next phase(s) of the project started.
One of the things I admired that Mrs. Iverson had was her tulip bed.
C:\Users\kiddqu\Downloads\2013-04-15 17.29.54-4.jpg
Robyn and I thought it would be a neat idea to recreate it.  The old stones were mostly missing; there were some strewn around different places in the yard, next to the garage and maple tree, but not enough to rebuild the tulip bed completely.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-04-11 15.28.11.jpg
The foundation of the original tulip bed was still there. We had been using it occasionally as a fire pit.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-04-12 12.03.31.jpg
We cleaned up and leveled the foundation and started laying blocks.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-04-12 16.56.12.jpg
We had plenty of dirt leftover from digging out the front retaining walls.  About 20 wheelbarrows full went into the bed and then it was topped off with about 6 inches of a good potting soil. (Note the leftover blocks in the background.)
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-04-13 12.27.49.jpg
We salvaged some of the old stones; planted some tulips, daffodils and hyacinths, and added a statute we picked up from our friend Sue's mom’s garage sale.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-05-11 17.02.42-1.jpg
And then back to the front of the yard.
One of the challenges we had with our yard was everything drained from the back southeast corner to the front northwest corner where the steps were.  
C:\Users\kiddqu\Dropbox\Personal\house\Steps\2014-03-29 08.58.46.jpg
This made the steps treacherous during the thaw/refreeze cycles we went through every spring.  So I set out to rectify that.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-04-26 14.55.32.jpg
I dug back another 3 or 4 feet and laid another layer of blocks.  While I didn’t put drain tile behind this level, I did put a layer of paver base and compacted it.  The tamper is in the background on the left.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-04-26 14.55.59.jpg
Using some marking paint, I outlined a quarter circle I was going to dig back from the steps.  
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-04-26 14.56.11.jpg
As I was digging it out, I found that an existing trough to route the water away from the steps had filled in over the years.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-04-26 15.46.41.jpg
This section was actually more difficult to dig out that the retaining wall because the roots from the spruce tree in front of the house had grown over to this side of the yard.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-05-09 08.30.15.jpg
The dirt that was dug out went behind the newest section of the retaining wall. Eventually it would be used to re-slope that part of the yard to direct the water flow towards the lilacs. (Note in the background they are just starting to bud.)
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-05-09 11.03.37.jpg
Once the quarter circle was leveled out, the old conduit and wire to the non-functional lamp post was removed.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-05-10 17.08.39.jpg
Blocks were laid with weed blocking fabric behind the wall.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-05-11 19.36.16.jpg
Nor did I forget the plastic drain tile.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-05-16 17.10.10.jpg
Some more of the old stones were salvaged and phlox was planted for the landscaping elements.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-05-20 14.39.33.jpg
With plenty of blocks available, we were able to tie the quarter circle retaining wall into both the top wall and the middle wall.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-05-30 08.01.10.jpg
I just love the birch trees up here in Minnesota and had to have one for our yard.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2014-05-30 20.50.08.jpg
So we ordered a cluster of them to serve as the center piece for the new retaining walls.  We re-transplanted some existing plants; added some blueberry bushes; and sowed some wildflowers.
C:\Users\kiddqu\Dropbox\Personal\house\Retaining Wall\2015-04-03 09.45.25.jpg
And were substantially complete.
Last completed project for 2014 was the painting of the front door.  
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2014-07-05 11.51.14.jpg
From this…
C:\Users\kiddqu\Dropbox\Personal\house\Deck and Doors\2014-07-05 16.33.06.jpg
…to this.

The fall also saw us starting the front step repair which I will talk about after the deck.

Feeling the breez, catching some rays...

For 2011 and 2012, the front porch had been the staging area for the work going on in the rest of the house. That is where we painted smaller items as well as cut items to size.  To say it was rough was a bit of an understatement.  So the summer of 2013, it was our major project.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.41.05-1.jpg
First order of business was to prime the bare wood.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.41.05-2.jpg
You may be able to tell from the photos the floor was also in very rough shape.  It was an old vinyl flooring of indeterminate age.  Because vinyl floor at one time was made using asbestos, we made the decision to seal the floor in place which would raise the floor up up inch to an inch and a quarter.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.41.04-2.jpg
There were already 2 existing outlets on the porch that were floor level which had to be raised up.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.41.04-1.jpg
I took the opportunity to replace the first outlet in the circuit with a GFCI outlet.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\IMAG2258.jpg
Since this was a 3 season porch, Robyn waited the room to have a beach feel.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\IMAG2259.jpg
Getting that room painted did wonders for how the porch looked, but that floor…
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\IMAG2262.jpg
A single sheet of plastic was spread over the floor and then furring strips were put down 16 inches on center.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\IMAG2263.jpg
The 14 ½ inch wide Styrofoam insulation fit right between them.  Only pieces for the outer edges had to be trimmed. (and of course, like every other room in the house, the floor was not square.)
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\IMAG2272.jpg
And the insulation was the same thickness as the furring strips so no additional woodworking was needed.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.41.10-1.jpg
½ inch plyboard was then laid on top of the insulation and furring strips.  That brought the floor level up to just below the level of the threshold of the door we added to the porch a couple of years earlier.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.41.13-3.jpg
Here, things strayed a bit from tradition.  I decided to draw lines with a permanent marker on the plyboard, 2 inches, 3 inches and 4 inches apart (in retrospect I wish I had done 3 inches, 4 inches and 5 inches apart since that would have added up to one foot)
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.41.20-1.jpg
We made a whitewash and then covered the plyboard with it.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.41.32-2.jpg
It was a bit tedious, but nowhere as tedious as those 1500 finishing nails Robyn and I used to attach the plyboard to the furring strips.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.42.00-2.jpg
3 coats of polyurethane later, trim was put down around the edges of the plyboard.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.41.59-3.jpg
Furniture was moved back on the porch.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.42.04-2.jpg
Wall hangings were put up.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.42.26.jpg
Libby, Robyn’s daughter, whitewashed a buffet we found on the side of the road.
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.42.41.jpg
It was the final touch to give Robyn her “beach retreat".
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.42.03-3.jpg
The room was “cat-approved.”
C:\Users\kiddqu\Dropbox\Personal\house\Front Porch\2013-12-18 20.42.12-2.jpg

…and a good place for Beef to get a back rub from 2 of the grandkids.